EMC Failures Are Almost Always Preventable
EMC failures late in a product development program are among the most disruptive and expensive problems an engineering team can face. A product that fails emissions or immunity testing after the hardware is finalized may require fundamental changes to the PCB layout, filtering strategy, or enclosure design — changes that consume weeks of engineering time and delay product launch.
The root cause of most late-stage EMC failures is the same: EMC was not treated as a design discipline from the beginning. Stack-up selection, power distribution network design, signal routing practices, filtering placement, and protection circuit topology were determined without EMC in mind.
At Pabst Electronics, EMC is a design input. Our engineers have followed EMC pre-compliance and compliance test execution firsthand — we know how test setups are configured, how coupling networks inject disturbances, and where under-protected designs fail. That knowledge is applied to every design we produce.
